Public Works Development Services Fee Schedule

On December 13, 2016 the City of Boulder City adopted Resolution Number 6569, approving new Development Service fees for the Public Works Department. These fees were effective January 1, 2017. Starting July 1, 2017 and each year after, the fees will be increased by 2.5% and shall be depicted as a fixed cost. The current fees are listed.


City of Boulder City Development Services

Public Works Permits, Study and Review Fees

DescriptionFees**

Permits


Excavation Permit < 60 Linear Feet$347.91
Excavation Permit > 60 Linear Feet$347.91 + $1.00 Per Foot Over 60 Feet
Non-Compliance Work Without PermitDouble Calculated Permit Fee
Non-Compliance With Permit$115.97 Per Occurrence
Driveway/Sidewalk Permit$110.17
Application For Deviation From Design Standards$57.98
Obstruction Permit$57.98


License


Encroachment$57.98
Encroachment Violation Fee$115.97 Per Occurrence


Electric


Design PlansConsultant Cost + 10%
Residential Electric Service Permit$86.98 App Fee, $289.93 After Permit Is Approved
Commercial Electric Service Permit$86.98 App Fee, $289.93 After Permit Is Approved
Non-Compliance Work Without PermitDouble Permit Fee
Non-Compliance With Permit$115.97 Per Occurrence


Hydrology/Drainage


Hydrology/Drainage StudyConsultant Cost + 10%
Hydrology/Drainage Study 3rd+ ReviewsConsultant Cost + 10%
Hydrology/Drainage Study RevisionConsultant Cost + 10%


Traffic


Traffic StudyConsultant Cost + 10%
Traffic Study 3rd+ ReviewsConsultant Cost + 10%
Traffic Study UpdateConsultant Cost + 10%


Temporary Traffic Control Plan$231.94 + $57.98 Per Day After 3rd Day
Temporary Traffic Control Plan Resubmittal$231.94
Temporary Traffic Control Plan Renewal$231.94
Non-Compliance Work Without PermitDouble Permit Fee
Non-Compliance With Permit$197.15 Per Occurrence


Civil Improvement


Residential Plan Review$289.93 + $57.98 Per Acre
Commercial Plan Review$289.93 + $57.98 Per Acre
Industrial Plan Review$289.93 + $57.98 Per Acre
Plan Check (Total Estimated Construction Cost)*2.25%
Plan Reproduction (per sheet)$17.40
Improvement Agreement$57.98
Plan Revision$440.68
Utility Investigation$57.98 Application Fee Per Lot


Inspection 1st $25,000 (Total Estimated Construction Cost)*7.50%
Inspection Next $75,000 (Total Estimated Construction Cost)*6.50%
Inspection Over $100,000 (Total Estimated Construction Cost)*4.30%


Re-Inspection$98.57
Same Day (1 hour minimum)$98.57 Per Hour
Overtime Inspection Fee On Friday (2 Hour Minimum)$98.57 Per Hour


Bond Replacement$579.85
Bond Progress Reduction$637.83
Bond Final Reduction$637.83